The existing building to the front of the school was requiring replacement. ESH designed a new building to provide new facilities listed above to enhance the main entrance and to be in keeping with the existing buildings but with a more contemporary approach. The building was designed to allow the construction to take place in two phases, and ensuring the continued safe operation of the school through these phases.